How long will the plumbing or heating job take?

There are no two jobs the same and it will depend entirely on what you have done as to how long the job takes. 

For guidance only below are the sort of times that are likely to apply:

  1. Bathroom/shower room installation 2 weeks

  2. Boiler installation straight swap 1 day

  3. Boiler installation change location or type 3 days

  4. Cylinder installation 2 days

  5. Full central heating system 5 days

  6. Tap fitting 1 to 2 hours

  7. Radiator fitting same place 1 day

At Divine Water (Lymington), we aim to complete our installations when we say we would, however, sometimes things materialise that you cannot reasonably predict. We will always work with you to overcome whatever issues that have risen to complete a quality job.